HOLMEN PUBLIC WORKS DEPARTMENT

2010 STREET RECONSTRUCTION & MAINTENANCE PROJECTS

updated March 5

 

RECONSTRUCTION PROJECTS (all projects cost estimate = $285,000, work expected to begin late April)

 

STREET                  PROJECT LIMITS                                PROJECT SCOPE                                                                NOTES

1st Ave. E.

 

State St.Lake St.

grind existing pavement & resurface

 

 replace sagging curb & gutter sections

ground-up asphalt is used as base course

 

2nd Ave. E.

 

State St. – N. dead end

grind existing pavement & resurface

 

repair 3 sewer main breaks & install 1 new manhole

 

replace sagging curb & gutter sections & extend it at the dead end

all streets will remain open to local traffic during construction

 

3rd Ave. E.

State St.Maple St.

grind existing pavement & resurface

 

replace sagging curb & gutter sections

poor soils @ sagging curb & gutter may be removed

 

Lake St.

 

All

grind existing pavement & resurface

 

replace 3" water main with 6"

 

replace a sagging sewer main, repair 2 main breaks & install 1 new manhole

 

replace sagging curb & gutter sections

temporary water services will be provided while water main is being replaced

 

Maple St.

 

All

grind existing pavement & resurface

 

replace sagging curb & gutter sections

any disturbed driveways will be repaired in-kind

 

E. Roberts St.

 

Main St.2nd Ave.

grind existing pavement & resurface

 

repair 60' of broken sewer main

 

replace all curb & gutter Main – 1st

large trees will be preserved although some roots will likely be cut

 

E. Wall St.

 

Main St.2nd Ave.

grind existing pavement & resurface

 

repair 1 sewer main break

 

replace sagging curb & gutter sections

 

 

 

 

 

 

 

SEALCOATING PROJECTS (all streets cost estimate = $54,000, work expected sometime after June 1)

 

STREET & PROJECT LIMITS                                                            PROJECT DETAILS                             NOTES

Angel Ct. @ N. of Eastwood St.

Case Ct. @ all

Cliffview Dr. @ all

Harvest Cir. @ all

Judith Ct. @ all

Malin Ct. @ all

Marlin St. @ Silver Dr.Case Ct.

Oakwood Dr. @ all

Pioneer Dr. @ Saddlewood St.Judith Ct.

Silver Dr. @ Marlin St.Pioneer Dr.

Viking Ave. @ Hale Dr.Neitzel Dr.

Viking Ct. @ all

Winchester Dr. @ all

Wolfe Dr. @ all

Sealcoats are applied to streets about 5 years after they are paved as a preventative maintenance practice to prolong the life of asphalt pavement

 

This year we are likely to again use a “sand seal” that can be driven on immediately but does generate some waste sand, so we’ll have to sweep it periodically

 

 

The “sand seal” is about 25% cheaper than the slurry seal we’ve used the last few years & doesn’t require streets to be closed overnight

 

Questions should be directed to the Holmen Public Works Department at 526-6322.